Calibration & equipment upgrade of cargo ship power plant
Scope of project: 3*2.5 MW steam turbo generators + 1 set of 27 MW steam turbo drive Supply, installation, upgrade and commissioning of cargo ship control system- Upgrade and replacement of boiler control system
- Upgrade turbo alternator, control and safety system
- Replacement of main machinery vibration
- Calibration and replacement of instrument ( PT, DPT, TC … )
- Tubing and cabling