Calibration & equipment upgrade of cargo ship power plant

Scope of project: 3*2.5 MW steam turbo generators + 1 set of 27 MW steam turbo drive Supply, installation, upgrade and commissioning of cargo ship control system
  • Upgrade and replacement of boiler control system
  • Upgrade turbo alternator, control and safety system
  • Replacement of main machinery vibration
  • Calibration and replacement of instrument ( PT, DPT, TC … )
  • Tubing and cabling
Share

Related Projects

3

BANDAR ABBAS Refinery

by aronpt Projects
6

ARVANDAN

by aronpt Projects
4

Engineering and commissioning of Farabi power plant

by aronpt Projects
1

Foroozan platform Gas turbines retrofit and overhaul

by aronpt Projects
demo-attachment-2303-Group-972
demo-attachment-2302-Group-971
demo-attachment-2301-Group-970
demo-attachment-2300-Group-969
demo-attachment-2299-Group-968
demo-attachment-2298-Group-967
cropped-logo-1-copy-2.png

aronpt

Aron Petrotech

Control department
  • Unit 804, Floor 8, Samarkand Complex, Janat Abad St. Tehran, Iran
  • +9821-44447158
  • Unit 504, Floor 5, Samarqand Complex, Janat Abad St. Tehran, Iran
  • +9821-44440935-37
  • Open Hours
  • Sat – Wed: 9 am – 5:30 pm,
  • Thu, Fri: CLOSED
Aero department
  • Unit 804, Floor 8, Samarkand Complex, Janat Abad St. Tehran, Iran
  • +9821-44440935
© 2025 aronpt. All rights reserved.
Shopping Basket