Engineering and commissioning of Farabi power plant
Project scope of work:
Steam turbine control system and switch gear installation and commissioning
Activities:
- 2*7MW Steam turbo generator installation
- control panel installation
- Switch gear installation
- Commissioning & SAT
- Test Procedure and Plan generation